TISIRI 2022-03-31T14:55:53Z https://tisiri.org/feed/atom/ WordPress Joe Kistel http://tisiri.org <![CDATA[What’s Underwater St. Augustine?]]> https://tisiri.org/?p=6158 2022-03-31T14:55:53Z 2022-03-31T14:55:10Z TISIRI's Joe Kistel recently provided a lecture at the University of Florida Whitney campus describing the underwater world, and related conservation efforts, of northeast Florida. The lecture was recorder and can be watched below:

The post What’s Underwater St. Augustine? first appeared on TISIRI.

]]>
0
Joe Kistel http://tisiri.org <![CDATA[New Reef Modules Landed on Target]]> https://tisiri.org/?p=6132 2021-12-22T16:22:54Z 2021-12-20T16:59:07Z In October the United States Coast Guard (USCG) Sector Jacksonville deployed several artificial reefs modules offshore northeast Florida at the John C. Leone Memorial Reef site (JCL Reef). Forterra Pipe and Precast provided 11 clean concrete risers and Gate Precast constructed a custom reef site marker for the ocean conservation project. Recently divers were able to visit the JCL reef Continue Reading

The post New Reef Modules Landed on Target first appeared on TISIRI.

]]>
0
Joe Kistel http://tisiri.org <![CDATA[Two Ships Scuttled]]> https://tisiri.org/?p=6122 2021-11-20T00:26:56Z 2021-10-13T15:38:09Z Two vessels were intentionally sunk offshore northeast Florida to create marine habitat and a new fishing and scuba ding location. Each vessel was over 100 feet long and went through rigorous preparations to become suitable artificial reef structures. Below are POV style videos showing how the vessels were scuttled. The vessels were sunk in 90 feet of water about 25 Continue Reading

The post Two Ships Scuttled first appeared on TISIRI.

]]>
0
Joe Kistel http://tisiri.org <![CDATA[New Reef Modules Deployed]]> https://tisiri.org/?p=6114 2021-04-30T13:50:07Z 2021-04-30T13:50:03Z Four new Reef Ball modules were deployed offshore St Augustine Florida at the St. Johns County "Bridge of Lions" artificial reef permit area. The reef ball GPS coordinates are: 29° 52'594 81° 09'164 Here is a brief video of the reef balls being placed into the ocean.

The post New Reef Modules Deployed first appeared on TISIRI.

]]>
0
Joe Kistel http://tisiri.org <![CDATA[2 Years of Reef Evolution]]> https://tisiri.org/?p=6104 2020-09-17T17:33:56Z 2020-09-11T14:31:05Z It is nearly the 2 year anniversary since a giant barge load of concrete reef materials, provided by Gate Precast, was placed into the ocean offshore Ponte Vedra. We just completed a dive investigation of the new artificial reef to check on progress. We were amazed at what we observed and provide a video and a few images below... It Continue Reading

The post 2 Years of Reef Evolution first appeared on TISIRI.

]]>
0
Joe Kistel http://tisiri.org <![CDATA[100 Year Old Shipwreck Investigation]]> https://tisiri.org/?p=6089 2020-07-07T14:21:59Z 2020-07-07T14:21:56Z Off the coast of St Augustine Florida there lies a shipwreck that has been known to local anglers as the "Bear Wreck." Recently the sunken wreckage has been identified as the remains of the infamous missing ship the Cotopaxi by Michael Barnette and LAMP ( Lighthouse Archaeological Maritime Program). A team of scuba divers investigated the wreckage and produced this Continue Reading

The post 100 Year Old Shipwreck Investigation first appeared on TISIRI.

]]>
0
Joe Kistel http://tisiri.org <![CDATA[Site Selection For Tugboat Reef]]> https://tisiri.org/?p=6065 2019-10-08T03:21:45Z 2019-10-08T03:19:46Z Artificial Reef Pre-Deployment Survey Harms Ledge Permitted Area 10-4-19 Final Report   Prepared for: The City of Jacksonville Water Quality Branch Environmental Quality Division Environmental & Compliance Dept. 407 N. Laural Street, Suite 300 Jacksonville, FL 32202   Re: Jimmy Dales Tugboat Reef Pre-Deployment Survey Permit No: SAJ-2007-00264-SCW Prepared by: Kistel Media LLC   Summary: To verify an adequate reef Continue Reading

The post Site Selection For Tugboat Reef first appeared on TISIRI.

]]>
0
Joe Kistel http://tisiri.org <![CDATA[Down At The Dock Kids Fishing]]> https://tisiri.org/?p=6051 2019-07-10T21:06:30Z 2019-07-10T21:03:55Z 7-10-19 The Jacksonville Offshore Sports Fishing Club and supporting organisations hosted a dockside fishing event for children with special needs today. Lots of fish were caught and smiles were made. One young man landed a red fish with a bunch of spots, another a nice sheep head, and even a few stingray and toad fish were landed. We used a Continue Reading

The post Down At The Dock Kids Fishing first appeared on TISIRI.

]]>
0
Joe Kistel http://tisiri.org <![CDATA[Artificial Reef Structures Evolve With Time]]> https://tisiri.org/?p=6041 2019-06-26T02:35:33Z 2019-06-25T22:54:49Z In the fall of 2018 concrete double "T" structures (built and provided by Gate Precast) were placed in the Ocean to create marine habitat and the Starship Reef, A Coastal Conservation Conservation - Building Conservation Trust- Shell project. These reef modules have been in the ocean just over a half a year and are already covered in marine life and Continue Reading

The post Artificial Reef Structures Evolve With Time first appeared on TISIRI.

]]>
0
Joe Kistel http://tisiri.org <![CDATA[Reef Blocks Have Landed, GPS Coordinates]]> https://tisiri.org/?p=6028 2019-06-06T21:04:57Z 2019-06-06T21:04:57Z The United States Coast Guard deployed several large concrete blocks to create marine habitat at a permitted artificial reef site offshore Mickler's Beach St. Johns County. The blocks deployed were retired navigational aid anchors. They once held large floating buoys in place but had expired their service life. USCG Sector Jacksonville and the Captain and Crew of the Maria Bray Continue Reading

The post Reef Blocks Have Landed, GPS Coordinates first appeared on TISIRI.

]]>
0